OverviewPin Oak Corpus Christi is expanding its midstream solutions for crude oil, NGL’s, and refined products with ~5 million barrels of storage capacity and a new Suezmax capable ship dock anticipated in late 2019. Key project additions include:
-4.5 million barrels of new crude oil storage capacity -1.1 million barrels of new NGL tank storage capacity -0.7 million barrels of existing product storage capacity -New Suezmax ship dock located along the Corpus Christi Ship Channel -Barge dock access with heated & insulated intra terminal pipelines, as well as light product and NGL connections -Rail access to Union Pacific and Kansas City Southern mainlines OpportunityCorpus Christi is the primary destination for Permian & Eagle Ford production with the lowest cost wellhead to market logistics, deeper ports, and less congestion. The area has ~800M bpd of refining capacity and three Class-1 railroads to connect a growing fuels market in Mexico and beyond.
|
Commodity(s) Handled:
Crude Oil, Intermediates, Refined Products, Purity Products/NGL’s Export Dock Capacity: 40,000 bph Crude 20,000 bph Products Connectivity: Local refineries Gray Oak & Red Oak Pipeline EPIC Crude Pipeline EPIC NGL Pipeline(s) Contact:
info@pinoakcorpus.com |
Explore the Project
Marine Terminal Overview
Approximately 4.6MM barrels of on site, multi-product storage
-Heated & non-heated, IFR, EFR, and cone roof tanks -Multiple docks (inland barges up to Suezmax-class vessels) -Manifest rail load/unload access by UPRR -Two-bay truck loading with weight scales, two-spot truck unloading |
Key pipeline connections:
-Taft Crude Oil Hub -Gray Oak Pipeline -Red Oak Pipeline -EPIC Pipeline -Citgo, Flint Hills, & Valero Refineries -Agua Nueva Rail Terminal |
PIN OAK TAFT
The Taft/Midway Junction is a key destination point for 4.5MM barrels per day of pipeline capacity originating in West Texas, South Texas, and the US Mid-Continent/Rockies. Pin Oak offers producers, refiners, and traders flexible solutions for multi-grade storage and access to deepwater export markets.
|
Terminal Overview
— 1.7 million barrels of crude storage under construction (2020) — 2.8 million barrels of expansion capacity available — Pipeline connections to Gray Oak Pipeline (2020) & Red Oak Pipeline (2021) — Pipeline connected to Corpus Christi and Ingleside markets —Additional third party connection opportunities: EPIC, Cactus II, Harvest, Nustar, and Koch/FHR pipelines |
Agua Nueva Rail – Unit Train Facility
The Agua Nueva Rail terminal is designed as a critical supply point for growing Products and NGL demand for inland Mexico destinations. Pin Oak Corpus Christi offers refinery and marine access for inbound shipments which are pipeline connected to the rail facility.
|
Terminal Overview
— Over 1.3 million barrels of product storage available; site is fully permitted —Rail siding buildout capacity for both manifest and unit train handling — Direct KCS Mainline connection — Connection to Pin Oak Corpus Christi terminal and other regional pipelines |